Image
Archive
People

Letter from Robert Stephenson to Curteis and Kingsford, Solicitors

Marshall's Geological Diagrams

Letter describing the opening of the Liverpool & Manchester Railway and the death of Sir William Huskisson MP after being run down by the "Rocket"

Manuscript entitled: "Catalogue of the Apparatus of Philosophical Instruments, in the Collection of Her Late Majesty Queen Charlotte, at the Observatory at Richmond in Surrey"

Temporary staging

Printed article extracted from the Durham County Advertiser

Printed article extracted from the Durham Chronicle

Printed memo completed in manuscript and addressed to Leonard Raisbeck

Handwritten Clarence Railway report

Handwritten copy of Stockton & Darlington Railway Company annual report

Pages 40 and 41 of John Graham's report book 1831-1833

Pages 18 and 19 of John Graham's report book 1831-1833

Pages 32 and 33 of John Graham's report book 1831-1833

Pages 36 and 37 of John Graham's report book 1831-1833

Fourth front flyleaf and page 1 of John Graham's report book 1831-1833

Pages 2 and 3 of John Graham's report book 1831-1833

Pages 32 and 33 of the Robert Stephenson & Co Ltd minute book no.1

Stepping No. 1 on or in central wheels. Figure 1. Figure 2. Various unnumbered elevations, plans and details.

Elevation of parts of middle group drawn in plan on No. 127.

Pages 80 and 81 of the Notebook of John Urpeth Rastrick

Pages 76 and 77 of the Notebook of John Urpeth Rastrick

Pages 74 and 75 of the Notebook of John Urpeth Rastrick

Pages 88 and 89 of the Notebook of John Urpeth Rastrick

"Planet" type frame drawing

Plan of Large Garnkirk Locomotive

Plan of Steam Boiler for Susquehana Locomotive

Small Garnskirk (sic) locomotive drawing

Untitled. This drawing is a cardboard model.

Gearing et cetera of Sketch dated July 31 1835. Plan, once part of Drawing 22.

Grouping arrangement. Abandoned end April 1835.

Method of grouping for the large machine.

Carriage by vertical chain. Plan, elevation.

Sketches of mill used for arranging operations on the engine of four wheels in each cage from April 1836 - August 1837.

Digit counting apparatus on the two upper wheel selectors.

Store variable selectors. Superseding drawing No 2.

Elevation of arrangement 13 with some of the driving and directive. Elevation includes section of a barrel '65 bands 80 verticals'.

Intended for engraving. Shows six barrels with reducing apparatus.

Plan of the left half to middle group for General Plan 28.

Plan of consecutive mill counting apparatus for General Plan 28. Plan, note.

Motion for carrying the tens, plus and minus.

Sketch of an apparatus for advancing stereotype frames of the Difference Engine by cranks and backing them by weights. Superseded. Plan, elevation.

Long pinions in the position for stepping. Adding wheels and short pinions behind long wheels.

First sketch of all the parts in plan of the right half to middle group of General Plan 28. Plan, elevation.

Lifting apparatus by screw. Sheet 9.

Carriage and racks in sections. Sheet 10.

Side and end elevation of feed motion with shade. Second revision.

Parts of the slide for Planing machine. Plan, elevation.

Sections of framing and racks. Sheet 6.

Anticipating whole and half zero digit counting carriage. Plan, elevation and details.

Elevation of parts of the card counting apparatus for operation and variable cards.